
Completed · Institutional
Brightline Train Station
399 NW 2nd Ave, Boca Raton, Florida
Project overview
A closer look at a proposal moving through Boca Raton’s public review process.
Request for a Universal Conditional Approval (UC) modification and site plan amendment, with technical deviations for a modification in driveway design and a reduction in driveway reservoir distance, to allow for the construction of an approximately one (1)-story, 8,925 square foot train station and a 4.5 story, 171,050 square foot parking structure along with parking lot modifications to a 6.98 acre property containing a previously approved 41,932 square foot library and community garden.
This listing translates public planning information into an accessible editorial overview. Scope, timing and design can change as the application advances through review.
At a glance
The essential details.
- Status
- Completed
- Category
- Institutional
- Scale
- Scale on file
- Application
- Universal Conditional Approval
- Reviewing body
- City of Boca Raton
- Zoning
- On file
- Future land use
- On file
- Filed
- March 16, 2020
- Approved
- Pending
- City case
- UC-11-05R1/SPA
- City planner
- On file
Location
Where it sits.
What’s planned
A project in progress.
Request for a Universal Conditional Approval (UC) modification and site plan amendment, with technical deviations for a modification in driveway design and a reduction in driveway reservoir distance, to allow for the construction of an approximately one (1)-story, 8,925 square foot train station and a 4.5 story, 171,050 square foot parking structure along with parking lot modifications to a 6.98 acre property containing a previously approved 41,932 square foot library and community garden.
Review city sourceContinue exploring

