
Project overview
A closer look at a proposal moving through Boca Raton’s public review process.
Request for the construction of a dock and finger pier extending approximately 196.2 feet into Lake Wyman in lieu of the maximum 60 feet, requiring a 136.2-foot variance from Section 22- 62(6). Additionally, a request to maintain zero side setbacks in lieu of 10 feet for docks, as the pier will be shared between two single-family parcels, requiring a variance from Section 22- 58(3).
This listing translates public planning information into an accessible editorial overview. Scope, timing and design can change as the application advances through review.
At a glance
The essential details.
- Status
- Proposed
- Category
- Marine
- Scale
- Scale on file
- Application
- Marine Structure Variance
- Reviewing body
- City of Boca Raton
- Zoning
- On file
- Future land use
- On file
- Filed
- July 25, 2025
- Approved
- Pending
- City case
- VA-25-03 (PZMV2025-00001)
- City planner
- Tori Boone
Location
Where it sits.
What’s planned
A project in progress.
Request for the construction of a dock and finger pier extending approximately 196.2 feet into Lake Wyman in lieu of the maximum 60 feet, requiring a 136.2-foot variance from Section 22- 62(6). Additionally, a request to maintain zero side setbacks in lieu of 10 feet for docks, as the pier will be shared between two single-family parcels, requiring a variance from Section 22- 58(3).
Review city sourceContinue exploring

